The company building the long-contested Keystone XL oil pipeline notified the Cheyenne River Sioux Tribe in a letter…

The company building the long-contested Keystone XL oil pipeline notified the Cheyenne River Sioux Tribe in a letter this week that it will start stockpiling equipment along the pipeline’s route this month in preparation for construction.

Tribal Chairman Harold Frazier sent back a sharp, one-line response: “We will be waiting.”

https://insideclimatenews.org/news/13072018/keystone-xl-pipeline-native-american-resistance-oil-spill-cheyenne-river-sioux-dakota-access-transcanada